Showing posts with label Tiles. Show all posts
Showing posts with label Tiles. Show all posts

Tuesday, 5 February 2019

"RUB- A- DUB- DUB" - the TUB



Late last December I thought I'd better get serious about working on the 3rd floor of Villa Leone. I actually began by enlarging the attic window at the front of the kit, using a couple of left over kit window frames from the lower floors. 

I made the front window Wider and Taller to make it easier to see inside, since I had worked out a floor plan of angles and hidden corners for the bathroom.  So using my utility knife, I began hacking out the shape of the frame, and a right mess I made of it too, so
 there was no going back once I'd started. 

Below is the enlarged exterior ATTIC window in its VERY RAW condition. 

I also enlarged the arched opening on the opposite side of the front wall and "squared" it off.

The walls are lined with foam board and the sub floor is
cardboard.  



Image result for greenleaf the willowcrest
here's what the kit looks like when assembled as per the instructions.
You can see that the dormers are a lot smaller than mine
and also how the arched opening at the front of the house
was squared off and modified.
(thanks to Sam for the idea to include a reference photo) 

These are the renovated dormers in the attic; 
utilizing and modifying more of the kits lower floor window frames, to accommodate the enlarged alcoves.
I wanted to be able to use the alcoves for furniture as well as increase the natural light and views into the rooms. 



 exterior of the left window alcove.

Now regarding the bathroom and all my earlier talk about having a fireplace in it;  
 sadly
"no can do"😕

 I had 3 bathroom fixtures to install and I'd already reduced the available wall space. 
Therefore, when it came to choosing between 
 having a tub or having a fireplace, 
The Tub won- hand's down! 
(Rub a dub dub!) 

To make a space in the bathroom for the tub to sit,
I built an "L"-shaped wall and positioned a split-door
 at a right angle 
on the end of it. 

The placement of the door, decreased the view from the open end of the bathroom to about 4 1/2 inches 
which is why the bigger front and side window alcoves 
proved to be a good idea. 


This is the view looking into the bathroom
 from the opened end of the villa towards the front.

(above: an early Mock Up, of the 3rd floor 
with the walls pinned and taped into place)

 
Along the way, 
I've replaced a lot of my original ideas with others. 
Even so, the basic layout is much the same.
On the left side of the 3rd floor,

 is the Gondolier's Study/Dressing room.
An enclosed hall is in the middle with a long window in the wall facing the viewer.  

The window looks into the narrow end  of the bathroom. 

Once I'd worked out the floor plan,
I installed the electrical runs, 

 TESTED EVERYTHING
then I glued in the cardboard sub-floor 

and proceeded with installing a hardwood floor. 
I had purchased 2 natural wood bamboo placemats from a dollar store and cut them apart and glued the strips to the cardboard base using FABRIC Hi-TAK glue from Wal-mart. 





The light wood shows you the size and shape of the bathroom which has lots of floor space but little wall space.
After the glue had firmly set, I went over the boards with a glue eraser which easily removed all the excess adhesive 

which had oozed onto the surface.  
I sanded the floor several times before I
 wiped it clean with a damp sponge. 


I stained the wood with a VERY DARK oil based stain, 
and when it was dry to the touch,
 I went over the entire floor with a Dry wall patch to fill in between the slightly beveled wood planks.
 
I scooped off the excess compound which in turn,
 lifted some of the dark stain with it,
  then I wiped them down again with a damp sponge
 and a dry paper towel.
After the putty had set, I went over the floors a second time with  the dark oil based stain.  





The results were that the floor looked less 
like a bamboo placemat, 
and more like a worn and weathered plank wood floor-

I painted and aged the bathroom doors, and
counter sunk the door thresh-hold into the floorboards to make it flush with the hardwood. For the photos I've pinned it upright to the foamboard wall with blue tac and sewing pins.


the photo below shows the tub on other side of the short wall


My mother bought this Bodo Hennig metal tub for me back in the 1990's during one of her visits to Europe and I loved it!  It used to reside in my Greenleaf Glencroft dollhouse, but after I gave up minis for 12 years, the tub sat ignored and neglected and subjected to the cold and damp inside my garage. 
As a result, the tub's legs are badly corroded.  Nevertheless, I decided that this was A PLUS for the Villa's bathroom.  So other than just a little touch-up of gold Pentel poster color, on the legs, I left the majority of the corrosion fully exposed. 
I painted the outside of the tub with a golden brown acrylic paint and aged it with a thin black wash of matt acrylic paint and  graphite pencil, as you can see in the photo below. 



Storage in the bathroom is minimal as is the opportunity for display, so when I remembered I had this shelf unit from my friend Bettie Smith, 
the ONLY place it would fit
 was in front of the tub, 
and so
the only way you can see it,

will be from looking through the enlarged window 
at the front of the Villa. 


an aerial view of the layout of the attic bathroom


The sink that you see below

 also came out of my Greenleaf Glencroft, and was cobbled together from a pink plastic doll sink found at the thrift store and a cake pillar support.
The toilet was part of an unglazed 3 piece ceramic set ( thrift store) which had previously been painted a melon colour.  

The toilet seat doesn't lift but it was easy enough to repaint 
to look as if it does.   

above and below are mock ups without the interior walls so you can see how the fixtures are positioned within the space.
The only things glued in are the floor and the wall tiles

 on the mirror wall 
 everything else is freestanding including the wall panels themselves. 

Re: the TILES

Initially I had planned for more yellow-gold wall tiles. 
But when they didn't work out, I had to change them to something entirely different.  
These replacement tiles look rather odd with this wallpaper 
but until I figure out what to do about it, 
I can't glue anything into place. 

The photo below was taken in mid-January
and not much has changed since.

I had the dollar store green cupboard for AGES and it fit into the alcove as if was custom made.
I'll probably fill it with towels and other bathroom necessities.   


Looking in from outside the alcoved window,  
towards the little chest in the far corner the bathroom.

The photo below is the long view

 looking straight ahead through the same alcove window,
through the bathroom door
 across the hall landing and into the Gondolier's Study
on the opposite side of the Villa.

fyi
to take the following photographs,
I have removed the interior BATHROOM WALLS 
and the TUB
 FROM the Dollhouse  
and onto my work table,
 rather than try and shoot through the windows  



Once I had the wall and the tub on my desk before me,
I began filling the shelves and accessorizing the tub.
To facilitate the view and open up the dark corners, 
 I made a pair of "iron-look" wall lamps. One for by the sink and the other for over the tub.

I made the orange tree a number of years ago, 
and Fatima made the floral hydrangea-print pitcher.  
The gold cherub is an earring, and the potted purple hydrangea 
is a recent gift, made by the talented Jodi Hippler.

I LOVE this grouping although to me,
 it looks more English than Italian despite the stone seat. 
Which brings me to 
my NEXT CHALLENGE. 

HOW TO MAKE THIS BATHROOM LOOK MORE MEDITERRANEAN? 

This is proving to be more difficult than I'd thought.

I've tried all types of changes and nothing is making me happy.
But then Last night
I decided to add a mural above the tiles around the tub from a photocopy which I had printed out a few weeks ago 

for a different project. 
I sliced the print into 3 sections.
The bottom section I glued to the long wall above the tub.
The middle section of the print
was cut to fit around the shelf unit where majority of the picture would be cut away thereby making the subject itself

 more obscure.
Yet because of the equal values of the colours and tones,
it reads like one continuous print even though the corners
don't line up at all.


The vertical wood trims are temporarily stuck on with blue tac and won't be glued in until ALL the interior walls and the bathroom ceiling are fitted into place. 
Meanwhile 
 the horizontal trims are still in the process of being amended. 

The lion rug bath mat
 is a paper cutout which I shall eventually
re-size and re-print onto a suede paper. 










The Fornasetti  wall-plaques are magazine cutouts glued onto punched chipboard rounds; 
 glazed with clear nail varnish.
I've blue-tacked them to the wall for the photos,
 but they'll probably get changed later on, too. 

All in all,
I'm much happier with the mural 
 than I was with the wallpaper,
but naturally when you change one thing
it affects everything else around it.
Sooooo...

as of last night,
I've made up my mind to change 

the rest of the wallpaper in the bathroom
which I can't show as yet because
 I am still tentatively feeling my way through 

each and every stage of this transition 
and 
this post is already long enough! 

And so in summary:

what began as full steam ahead in December
came to a full stop in January;
which is now a slow crawl into February

 leaving only 
8 months until the Show in September!

oh the pressure! the pressure! 
~ 😳 ~

Rub

 a 
dub dub







elizabeth

Friday, 6 April 2018

Stonewalled by Villa Leone



Stonewalling is a refusal to communicate or cooperate. 
 Wikipedia
 Villa Leone, has been deliberately refusing to cooperate with me
which means that 
 I've had nothing of interest to communicate
on my blog.

 There's been nothing new
to show you since 
 January 14th
because
I've been busy pouting.

I've been mad at Leone for stonewalling me

I'd suggest an idea but Leone would refuse it. 
So I'd try something else, 
however it didn't matter what I came up with because, 
 the Villa rejected all of my ideas for it. 

This went on
 week after week

and since 
Leone 
stubbornly refused to communicate or cooperate-
 I stubbornly continued to pout

Secretly I knew that the Villa 
was pushing hard for me to make the staircase for the second floor 
yet I continued to resist 
because frankly-
I hate making stairs.

Eventually, I opted for a reconciliation. 

  Reluctantly, 
I resigned myself 
to working on the Villa's second floor staircase 
leading up to a 3rd floor Master Bedroom. 

But I wanted as much floor space on the 3rd level as possible 
so I figured the best approach 
was to install the second flight of stairs 
right next to the first. 
I papered the ceiling, cut the hole for the stairs, made the tile floor for the hallway using 
a STAND IN flight of steps 
as a temporary substitute for those
which I will eventually have to build.

At the same time
I also had to plan out the bathroom which will be 
the room closest to the viewer,
 as well as 
plan the layout for the adjacent library/music room 
on the second floor.  

 Many fine details for the entire second floor
 had to be planned 
simultaneously. 

Once I had a workable floor-plan, 
and had cut out the opening in the ceiling for the stairs,
I began constructing the interior walls 
for the 2nd floor hall and its future staircase. 

For the dividing stair/bathroom wall,
I cut out a window to provide additional light and interest in this tall, dark stairwell, 
and would look good 
on the bathroom side of the wall, too.  

The "iron" grill was added to the window 
to help dress it up.
I fashioned the "L"shaped STONE WALL to not only enclose the first floor stairwell, 
but to also support the run of the staircase 
on its opposite side.

Since the stair enclosure looked plain to me, 
and since I have lots of cherubs in my stash, 
I decided to add a couple of angelic"carvings" to further embellish the walls.

The musical cherubs were glued in place
 and painted to match the stone. 



The cartouche carvings were a gift from Fatima 
which I cut to fit, 
later I added the extra bit of plastic curlicue 
cut from a doily
 to fill up the space underneath it. 
I found a hanging light fixture in my stash and tried it out in the hall.
(but HOW will they 
(or I) ever be able to change the bulb?)
hmmmm? 
I don't know
😐
moving on

I also made the tile floor for the hall

 from sheets of 
Scrap Book paper 
from THE HOBBY LOBBY



At this stage I was feeling pretty confident about my progress.
that is
UNTIL IT WAS TIME TO BEGIN WORK ON THE ACTUAL STAIRCASE


and this is when I ran headlong into
another STONE WALL! ➽
l
Megan from the blog
"CREATIVE ME"
 http://www.blog.creativeme.co.za/
ran into exactly the same problem.
She discovered that she no room at the top of her staircase for a landing
and 
Whoops!
 neither did I!
☠
Try as I might
(And I did try)
there was no room to step off the top stair.
EVEN WORSE
there was NO ROOM for A BEDROOM 
or 
A BED
 on the 3rd floor!

I did EVERYTHING I could to try to have a bed up there
 but there just wasn't enough room! 
☠☠☠ 
by now, I was 
ANGRY AND FRUSTRATED! 
 I realized that I would have to forfeit either 
the entire bedroom 
 or
 a staircase leading up to it
because 
Leone 
wouldn't let me have both!

 STONEWALLED! 

PERIOD!

In theory there's
 SCADS of space in the attic 
however there's also inset interior walls
which support the roof
as well as the 3 recessed windows on all three walls, 
AND
 a long hole in the floor to accommodate the staircase,
so in reality,
there's very little usable wall or floorspace despite it's great size. 
 I realized that I was snookered. 
sooooo,
after some more required pouting,
 I chose to move the stairs 
to the opposite side of the hall 
so I could at least have a landing.
 in fact:
the new position of the staircase is
very
 close to their
Designated Location 
as per the original instructions in the kit.
duh! 
(I guess I should have read them😏)

Thus, the attic bedroom was moved down to the
SECOND FLOOR, 
leaving enough room on the 3rd floor for it to become 
the library/music room.

I think that this arrangement will work.

and 

Sooooo 
now 
everything 
I had already done
had to be 
UNDONE
Which meant that I had to patch up the hole I'd cut in the ceiling, 

then recut a new one. 
I also had to entirely cover over the old ceiling paper in the hall 
with a new ceiling paper
 to hide my ugly patch job.

I also decided to remove and dismantled the existing stone walls and make a half wall instead.  
When that was done, 
this is what it looked like




I found smaller seated cherub in my stash and glued it next to the ball on the banister,
then tried out the arrangement with
"Isabella"

requesting that she perform the balcony scene from 
"Romeo and Juliet"


but alas! 
she was up-staged!
Visually there was
TOO MUCH STUFF GOING ON

the cherub with the harp 
was 
Stealing the show 
and the view from afar
looked 
really odd

like- what IS all that stuff over there?
soooooo
I pried off both of the angels, ditched the small one and moved the bigger cherub further down the pony wall,
 gluing it in between both of the cartouches.

I left the ball on the banister alone. 

Now it looks like this
and as it happens,
this new half wall will make it easier in the future

 for Isabella
(probably me)
to change the
light bulb in the hanging fixture


Meanwhile 

 a little Shakespeare, 
if you please...
"O Romeo, Romeo! Wherefore art thou Romeo?
 
Deny thy father and refuse thy name.

Or, if thou wilt not, be but sworn my love,

 And I'll no longer be a Capulet."


Truthfully
I like the look of the half wall much better! 

and now that the angels are out of sight- 
it looks cleaner
The floor tiles haven't been glued down
since there are
electrical wires for the first floor ceiling lights
 directly underneath it.
They will need to be connected 

to the power strips
before the tile are permanently affixed, 
and once the floor is installed I will build the dividing wall between the hall
and 
the bedroom.

FYI
One of the most difficult tasks I had to perform, was getting my hand and arm through a window to apply the drywall filler along the join between the bathroom wall and the exterior wall, 
while working carefully around 
the hanging lamp and the pictures. 
Then I had to clean up the resulting mess.
I also had to paint it with a 
VERY LONG HANDLED BRUSH! 
Whew!

When I told Janine that I had learned to become 
a contortionist 
 I wasn't kidding
 oh

the hoops we'll jump through for the sake of this hobby!
ugggh
After I viewed the above photo 
I knew I needed to install some ceiling trim. 

><
BLAST! 
out comes the tub of wall putty 

and all those paints
 again!

Arrrggh!
not again
! 😠
 an unsightly
 tiny blob of putty
is clinging to the framed painting

how annoying!

Gold gilded frames in the gallery
 came courtesy of
Jean-Claude at

Maison française 1/12
♥
thank you again Jean-Claude! 

Artwork on the narrow wall 
leading towards 
the bathroom,
 are a round brass button cover,
a cherub earring, 

and a coat of arms with a lion in the center of the shield
Viva Leone!   
and yes,
 me and the Villa are on speaking terms again
And so there you have it!
weeks of pouting 

and of doing nothing,
and then 
of doing something
and all for what?-


a pony wall.


 hey,

 that's how I roll
even 
when I'm stonewalled

by the way,
 I still have to make the stairs! >< 
☠
but...

 I think that's h-all 
for now
Leone


elizabeth



DO OVERS! a Glencroft Living room redecoration